Project Scheduling Analysis With CPM PERT Method (Case Study on Tasikmalaya City Swasana Village Restaurant Project)

Authors

  • Delfi Santika Program Studi Manajemen, Fakultas Ekonomi Dan Bisnis, Universitas Perjuangan Tasikmalaya
  • Suci Putri Lestari Program Studi Manajemen, Fakultas Ekonomi Dan Bisnis, Universitas Perjuangan Tasikmalaya
  • Barin Barlian Program Studi Manajemen, Fakultas Ekonomi Dan Bisnis, Universitas Perjuangan Tasikmalaya

DOI:

https://doi.org/10.53697/jim.v2i3.909

Keywords:

Project Management, Project Scheduling, CPM, PERT

Abstract

This study aims to determine the analysis of project scheduling using the Critical Path Method (CPM) Program Evaluation and Review Technique (PERT) method in the Tasikmalaya Swasana Village Restaurant project. The method used in this study is a qualitative descriptive method. By taking data on all activities and costs needed for the construction of a self-financing village restaurant. The data collected is in the form of primary data and secondary data. Data analysis in this study used POM for Windows QM Version 5. The results of the research from project scheduling using  the Critical Path Method (CPM) method can be completed for 29 weeks with a total cost needed of Rp. 1,606,633,852. while using the Program Evaluation and Review Technique (PERT) method which analyzes using three estimated times can find out the possibility that the project can be completed within 38 weeks with a success rate of 99% and the total cost that  it takes Rp. 1,606,633,852.

Downloads

Additional Files

Published

2022-09-07

How to Cite

Santika, D., Lestari , S. P. ., & Barlian , B. . (2022). Project Scheduling Analysis With CPM PERT Method (Case Study on Tasikmalaya City Swasana Village Restaurant Project). Journal of Indonesian Management, 2(3), 599–610. https://doi.org/10.53697/jim.v2i3.909

Issue

Section

Articles

Most read articles by the same author(s)

1 2 3 4 > >>